The Hoover Dam is a marvel of modern engineering and project management. It is a massive concrete dam that was built in the 1930s on the Colorado River, which forms the border between Arizona and Nevada. The dam was built to provide hydroelectric power, flood control, and irrigation to the western United States. The construction of the dam was an enormous undertaking that required the coordination of thousands of workers and the management of a vast array of resources.
The Hoover Dam project was initiated in the 1920s, when the U.S. government recognized the need for a reliable source of hydroelectric power in the West. The Colorado River was identified as an ideal location for a dam due to its large volume of water and its location in a region with a high demand for electricity. In 1922, Congress authorized the construction of the dam, and in 1928, the Boulder Canyon Project Act was passed, which provided funding for the project.
The project was managed by the U.S. Bureau of Reclamation, which was responsible for overseeing the construction of the dam. The bureau assembled a team of engineers, architects, and contractors to design and build the dam. The chief engineer for the project was Frank Crowe, who was known for his innovative approach to construction. Crowe implemented a number of new technologies and techniques to speed up the construction process and reduce costs.
One of the most significant challenges of the Hoover Dam project was the sheer size of the dam. At 726 feet tall and more than 1,200 feet long, the dam is one of the largest in the world. It took more than four million cubic yards of concrete to construct the dam, which was poured into a series of blocks that were then placed one on top of the other to create the final structure. The project also required the construction of a massive network of tunnels, pipelines, and other infrastructure to support the dam and its hydroelectric power generation facilities.
Another major challenge of the Hoover Dam project was the logistical complexity of coordinating the work of thousands of workers from diverse backgrounds. The project employed workers from all over the country, including immigrants from Europe and Latin America. To manage this diverse workforce, the project managers implemented a number of innovative strategies, including the use of prefabricated housing and the creation of a company town called Boulder City.
Despite the many challenges, the Hoover Dam project was completed on time and within budget. The dam was officially dedicated in 1935, and it has been in operation ever since, providing vital hydroelectric power, flood control, and irrigation to the western United States. The Hoover Dam remains a testament to the power of effective project management and the ability of humans to overcome even the most daunting challenges.
Hoover Dam Bypass
Wozencraft begins dreaming of irrigating the Imperial Valley by channeling waters from the Colorado through the Salton Sink. Whether by peaceful means or through war, the cause for this melding of cultures is unknown. Others simply loaded their cars or wagons to make a fresh start. A system of high wire cables and pulleys picked up the concrete buckets and swung each one over to be positioned and released from its container by waiting workmen. Retrieved June 21, 2010. In court, the investigator was able to detail colorful and unflattering pasts for each of the men filing suit against Six Companies. They also spent months working out how to pour concrete that would set correctly in the searing heat of the desert.
Retrieved October 9, 2018. This left no time for barracks or family housing to be built. While temperatures in the Las Vegas Valley were in the mild 90s, temperatures on the floor of Black Canyon soared to well over 120 degrees. The government gave up the search and wrote the bit off as a loss. Water from the lake drives turbines inside the dam that generate electricity for Arizona, Nevada, and Southern California. .
What the Hoover Dam teaches us about project management
Others were convinced that the contractors would go bust. What they see is one of the wonders of the modern industrial world. Six Companies avoided this lawsuit for several months by various means and continued work on the tunnels until it could no longer be avoided. Lunches packed for husbands often spoiled because of the heat. Years later, dam excavation crews came across his remains buried in the deep silt of the river, and he was identified by his clothing.
Reno, NV: University of Nevada Press. Once cleared of all lose rock, the tunnels were lined with concrete. An experienced engineer who had worked for the Bureau of Reclamation since 1905, Crowe was perfect for the job. Young Hoon Kwak a John Walewski b Dana Sleeper c Hessam Sadatsafavi b a Department of Decision Sciences School of Business The George Washington University Washington DC 20052 United States b Department of Civil Engineering Texas AM University College Station. If controlled, the Colorado could irrigate countless acres of potential farmland. Because of the Depression, the government strongly suggested that Six Companies begin construction on the dam six months early. Retrieved August 1, 2020.
Great Project Management Challenges; The Hoover Dam
Over 700 feet tall, it has been standing here, on the Nevada-Arizona border, since 1935, having been completed just four short years after the award of the contract and two years ahead of schedule. Both times, when inspecting the tunnels after the spillways were used, engineers found major damage to the concrete linings and underlying rock. When After Hoover's election defeat in 1932 and the accession of the Roosevelt administration, Secretary Ickes ordered on May 13, 1933, that the dam be referred to as Boulder Dam. The Hoover Dam was completed two years ahead of schedule and under budget despite political, economical, technical, and organizational obstacles. And that was because the customer had died. The cofferdam was slowly built until finally it broke the surface of the water.
Colossus: Hoover Dam and the Making of the American Century. From Jubail Industrial City in Saudi Arabia to the Channel Tunnel and High Speed 1, Bechtel has become the go-to company for projects that test the level of human achievement. After intense winter flooding, the temporary diversion works at the Mexican head gate failed and the river ran unchecked through the Imperial Canal. But the Pueblo introduced adobe above ground structures. A historical review of the Hoover Dam project reveals that the project team implemented a number of innovative strategies and practices that are comparable to critical success factors for today's megaprojects to overcome monumental project challenges and obstacles.
Retrieved September 29, 2013. Stretching over 100 miles, the reservoir, Lake Mead, became the first National Recreation Area in the United States. The project will gain the company a new client will Improve our policy of expansion. Overall, there is enough concrete in the dam to pave a two-lane highway from San Francisco to New York. There was no way the dam could be poured continuously; it would have to be done in separate interlocking blocks. In Memoirs of Matilda Reber Frehner, compiled by her children and grandchildren, Vivian Frehner recalled the move from St. The downstream halves of the tunnels following the inner plugs are now the main bodies of the spillway tunnels.
What can we learn from the Hoover Dam project that influenced modern project management?
When men were able to find work in the first phase of the dam construction it was occasionally on an auxiliary project such as building rail lines to the dam. The number of men working on the project was huge, making it impossible to know everyone, even if on the same shift. These can be simply the scheduling of what aspects should be done and in what order anticipating any bottlenecks for suppliers or trades considering any approvals that may be required in advance together with all health and safety requirements something less prevalent on the Hoover Dam build it has to be said. This signature bridge spans the Black Canyon about 1,500 feet south of the Hoover Dam , connecting the Arizona and Nevada Approach highways nearly 900-feet above the Colorado River. Whether an extensive refurbishment is being conducted or an office move, we spend time talking through the precise sequences of events that will take place to complete the project successfully. Many years later, a visitor to the dam said that the name "Nig" was racist, and it was decided that the memorial should be changed to read "Boulder Dam Mascot. Long-Term Properties of Hoover Dam Mass Concrete.
Ickes stated that Wilbur had been imprudent in naming the dam after a sitting president, that Congress had never ratified his choice, and that it had long been referred to as Boulder Dam. As lawyers argued the case, workers watched as their comrades were hospitalized for respiratory problems. Although his origins were unknown, the men liked to say that Nig, a dog with black fur and a white blaze on his chest, was born under the floorboards of one of the dormitories. Around the world, people associate Bechtel with megaprojects—engineering and construction jobs too big for other companies. When Ickes spoke at the dedication ceremony on September 30, 1935, he was determined, as he recorded in his diary, "to try to nail down for good and all the name Boulder Dam. National Register of Historic Places.
Past efforts at forcing the Colorado under human will had met with varying degrees of success. So I decided then I had better move to Boulder City. This was widely ignored, however, in Las Vegas and its surrounding areas. Retrieved February 12, 2022. Located on the floor of Black Canyon near the construction site, Ragtown consisted of tents, cardboard boxes, and anything else families could get their hands on. Retrieved January 20, 2021. But where is this Boulder Dam I keep hearing about? Hoover Dam Construction 1 Hoover Dam Construction 2 Geological Context Canyons tilted layers of andersite breccias Extrusive igneous rock Minerals - plagioclase pyroxene hornblende Withstand 200mpa in compression Formed around 15 million years ago cenozoic period Thick layer of sand and gravel on the canyon floor 3 Geological Context.